*

Park City Golf Club's Future Is Being Decided by Its Winters

October 15, 2026
Do you want content like this delivered to your inbox?
Winter light falls across a granite terrace beside a cedar soffit, closed bronze-framed glazing and a snow-edged stone planting bed with a limber pine.

Over the next three weeks, the course in the middle of Park Meadows starts getting ready for snow. Regular-season golf rates end October 15, and White Pine Touring's pre-season Nordic pass pricing ends October 31. Meanwhile Park City Council has a renovation plan on the table that it hasn't approved. The plan began as a sprinkler replacement. Its biggest unresolved question now is whether the course gets its own snowmaking. That makes the city-owned Park City Golf Club a winter question as much as a golf question. The case for that comes from last season, and from a single $3 million line in the September council minutes.

The October Handover, Date by Date

The city's rates and policies page runs regular-season rates from the Friday before Memorial Day through October 15. Off-season rates apply after that. The page doesn't give a 2026 closing day, and the city hasn't announced one. October 15 marks a change in pricing. It doesn't close the course.

The winter side of the calendar is firmer. TownLift reported in September that White Pine Touring had opened 2026–27 track-pass sales, with pre-season pricing for passes bought before November 1.

Date What changes Where
Oct. 9 Pass pickup and pass photos begin White Pine Touring shop, Bonanza Drive
Oct. 15 Last day of regular-season golf rates Park City Golf Club
Oct. 31 Last day of pre-season Nordic pass pricing Online or in person
Nov. 1 New Nordic pass prices take effect White Pine Touring
Oct. 22 Next regular City Council meeting; agenda not yet posted Park City Municipal
To be announced Nordic Center opens; pickup moves there 1541 Thaynes Canyon Drive

One detail matters for Park Meadows households in particular. Local 84060 passes can't be bought online. You buy them in person at the Bonanza Drive shop, which White Pine lists at 1790 Bonanza Drive, and you show a valid Utah driver's license or state-issued ID. Once the Nordic Center opens, pickup moves to the Nordic Center at 1541 Thaynes Canyon Drive. White Pine hasn't published an opening date.

The arrangement behind all this rarely gets a second thought. The city's golf club page says Park City Municipal contracts with White Pine Touring for Nordic skiing on the city-owned course. A concession agreement covers hours, plowing and grooming on both the course and the McPolin Barn area. One piece of public land runs two businesses, one after the other.

Last Winter Showed the Weak Point

The second business had a rough 2025–26 season. In early February, KPCW reported that only 6 inches of snow had fallen since January 5. White Pine grooms more than 20 kilometers of classic and skate track, but it had pulled its groomers off the trails. None of the remaining trails made a continuous loop. Crews had closed four of the five loop trails, and grooming on the 3K was suspended. The same report said the Nordic Center had closed on Christmas Day that season, for the first time ever.

The same report noted that Soldier Hollow, which has snowmaking infrastructure, stayed open despite the warm temperatures, and that Mountain Trails Foundation kept grooming Bonanza Flat above Empire. The golf course has no snowmaking of its own. Seven months later, that came up at City Hall.

A Sprinkler Problem That Opens Up the Whole Course

The renovation started underground. KPCW's July coverage said the course's irrigation system dates to the early 1990s. Smaller, targeted sprinkler heads could cut runoff and save water. Replacing the system means extensive ground disturbance, so the city started asking what else to rebuild while the ground is open. At the September 17 work session, Golf Department staff said some lines had exploded and leaks could take a while to find. Course manager Vaughn Robinson also recommended replacing greens and fairways to deal with an invasive grass that in-house efforts hadn't eliminated.

The same July report noted that snow guns were already being considered because White Pine uses the course in winter, which is hard in low-snow years. Nordic skiing was part of the plan from early on.

The Draft Golf Course Master Plan was developed with golf course architects Beddo & Boyden and shown at a July open house. According to KPCW, the city's survey drew 380 responses. Greens, bunkers and fairway leveling ranked as top priorities, and most respondents preferred splitting the work over two seasons so half the course stays open each year. The draft plan includes these hole-level concepts:

  • A new short-game practice area, created by relocating the first tee and shifting the ninth green
  • Shorter holes 8 and 17
  • A longer hole 16
  • Hole 18 redesigned as a par 5
  • The 15th green moved near the water

The draft calls itself a long-range decision framework. It isn't a final design or a construction commitment. It says Nordic operations would continue, but it doesn't show a winter trail layout or commit to snowmaking. In July, The Park Record reported the work could mean a full one-year closure or nine holes at a time over two years. The start date could be as early as the following spring or as late as 2028.

What Council Asked For on September 17

According to the work session minutes, the full package would replace irrigation, rebuild all 18 putting greens, and renovate tees and bunkers. It would also adjust fairways and roughs, improve drainage and cart paths, add water-conscious landscaping and keep room for winter Nordic operations. Staff put the total at $15 million, spread across fiscal years 2027 through 2029. The budget director said that was double what had been budgeted. Estimates for irrigation alone differ by source. KPCW's September 21 report gave about $5.4 million, while the minutes record staff citing about $6 million, based on recent replacements at Salt Lake City courses. Staff also estimated a 60% revenue drop during construction.

The money question is about how the course is set up. Golf is run as an enterprise fund, meant to pay its own way. KPCW quoted Mayor Ryan Dickey describing the gap this way:

"We've treated it as an enterprise fund, but clearly we're giving it now a massive general fund subsidy, so we didn't really operate it as an enterprise fund."

Councilmember Bill Ciraco pointed to the tension in council's own goals, KPCW reported. The course is supposed to be self-sustaining and also affordable for residents, who pay $72 for 18 holes compared with $122 for non-residents at current rates. Ciraco said he didn't want to do the full project yet and asked for data on savings or new revenue. The rest of council agreed.

Councilmembers Molly Miller and Tana Toly wanted snowmaking considered as part of the upgrades, KPCW reported. When Councilmember Parigian asked about snowmaking for the Nordic track, Robinson estimated it would cost $3 million to lay separate water lines for Nordic skiing. That's a fifth of the $15 million package, for a feature the draft plan doesn't yet include. Miller asked to see snowmaking worked in, along with a plan for the course to fund major maintenance itself. The mayor said the next discussion should cover the business case, budget, design and snowmaking.

Snowmaking would need its own water lines, and the irrigation replacement is the project that already opens up the course. That puts the sprinkler decision and the question of how the course handles a dry winter like the last one in front of council at the same time.

What's Still Open

KPCW said council would return to golf course improvements "later this year." The city's meeting portal lists a regular council meeting on October 22. No agenda was posted when we checked, so the golf item may or may not come up that night. Questions about the draft plan go to Dawn Wagner in the Golf Department at [email protected]. Questions about winter operations on the course go to course manager Vaughn Robinson at [email protected]. Until council decides, this winter's Nordic season on the course runs the way last winter's did, on natural snow alone.

Whether the course you see from Meadows Drive gets rebuilt for one season or two is still being decided. At Joy Residential, Joy Larkin is following the golf course plan as it moves through council and is glad to talk through what each version could mean for homes along the fairways. Request a Private Consultation whenever you'd like that conversation.

Find Your Dream Home

Browse active listings in the area or contact us for off-market listings.

Home Search

What's Your Home Worth?

Have an expert help you find out what your home is really worth.

Home Valuation